For TLS initial construction photos, please click here to see the blog.
|
Riley Edwards points out various features of the new Test Track Section with participants from The Railway Academic Conference in July 2016.
|
A RailTEC student discusses his research using the Pulsating Load Testing Machine with conference attendees in June 2016.
|
2016 International Concrete Crosstie and Fastening System Symposium attendees listen to Riley Edwards discuss the new Test Track Section.
|
|
The large Scale Test Frame in the upper right side of this photograph was added in 2016.
|
Laboratory overview
|
TLS with wheelset
|
|
TLS wheelset close-up
|
Static Tie Tester (STT)
|
Control Platform
|
|
Instrumentation on TLS
|
Side of wheelset
|
MTS 100gpm HPU
|
|
Students on TLS
|
Amsted RPS visit to RAIL
|
CEE Department Head, Dr. Amr Elnashai, visit to RAIL
|
|
CN tamping TLS
|
Dr. Elnashai on TLS
|
Dr. Elnashai on TLS
|